Floods rarely arrive suddenly. Between heavy rainfall and the peak of a stream or river, often only minutes to a few hours pass. What matters is using that time. An early warning system combining precipitation measurement, water level measurement, data acquisition and a central alerting portal gives municipalities, fire services, public works departments and affected residents the information they need.
Why early warning must start locally
Heavy rain can occur anywhere, including away from watercourses. Regional weather services and warning apps often do not capture such events with sufficient precision. Those who know the water level in their own catchment area and measure the precipitation there directly gain independence and lead time.
A measurement-based concept starts exactly here: measurement takes place where the risk actually exists.
Two measurement levels for more lead time
The system combines two measuring tasks that complement each other.
Precipitation: a robust rain gauge
The rain gauge records rainfall amounts in the catchment area. Heavy rain is reported before the water reaches the watercourse, which gains valuable time in the alerting chain. What matters is a robust, corrosion-resistant device that measures reliably outdoors for years.
Water level: two measuring principles
- Two measuring principles are available for water level or level measurement:
Hydrostatic probe: measures the level via hydrostatic pressure. A slim design also suits stilling wells with a small diameter. - Non-contact radar measurement: measures the water level from above, without any sensor entering the water. This is particularly suitable for mounting on bridges and structures, for example where floating debris or sediment could affect a submerged probe.
Which principle is suitable depends on local conditions: channel cross-section, accessibility, risk of contamination and installation options
The data logger as the link
A data logger connects the sensors to the IoT web portal. It is usually mounted as a wall unit on structures and masts or built directly into gauge pipes. A robust design that resists environmental influences is important. Commissioning should be simple: the data logger is typically configured via a smartphone or tablet app over Bluetooth.
Data is transmitted through an integrated SIM card over cellular networks using established IoT standards, such as LTE-M or NB-IoT. To keep the transmission to the web portal secure, it should run through a VPN tunnel.
Equally important, access to the web portal is secured and the portal is hosted geo-redundantly.
Autonomous operation for many years
Early warning systems are mainly installed where no power supply is available. The data logger must therefore be designed for autonomous operation. Optimised energy management combined with lithium batteries enables operating lifetimes of several years, depending on the operating mode. Maintenance effort remains low, which is an important factor for measuring points in hard-to-reach locations. Optionally, the data logger can also be operated with PV modules and a battery. This configuration is only recommended at sites where the risk of vandalism is low.
Alerting via the IoT web portal
The measurement data converge in a central web portal. Responsible persons can see the status of all measuring points at a glance, the measured values as charts, and any anomalies. Alerts are triggered when limit values are exceeded, when a measuring point fails, or when measured values are implausible. The portal defines who is informed. Alarms can be sent by app, SMS or e-mail to the fire service, the public works department, the mayor and affected residents.
A map view with the GPS positions of the measuring points supports the assessment of the situation. Measured values can be exported automatically to the municipality's IT systems or embedded on the municipal website. Device parameterisation can also be carried out centrally via the platform. Preventive maintenance becomes possible, because sensor drift shows up early.
A practical example
A municipality in the Bavarian Forest lies in a basin where several streams from the surrounding slopes converge in the town centre. The town has been flooded several times in the past, mostly during local heavy thunderstorms that discharged further away, on a mountain ridge. To be warned early in future, the municipality opted for a flood early warning system. Two rain gauges were installed on the slopes in the catchment areas of two streams that lead directly into the town centre.
In addition, four water level measuring points were installed in the streams, mostly at critical locations such as bridges or culverts under roads, where there is a risk of blockage by debris during a flood
All measuring points report their data via the data loggers to the portal. When rainfall intensity rises sharply, the first alert is issued before the water level responds. Fire services and public works can prepare, and residents are informed. If further measuring points are added later, the system can easily be extended with an additional water level station or an additional rain gauge.
From planning to operation
Planning of the measuring points comes first. It is important to involve local experts early, such as public works staff who know all the critical points. Technicians from the supplier take part in the site inspection and review the key points. This reduces issues during commissioning. The devices require little maintenance and are simple to service should maintenance be needed. These services can additionally be offered on request.
Conclusion
Flood protection works best where data is available early and people are warned in time. The combination of rain gauge, water level measurement, data logger and alerting portal forms an early warning chain that runs from rainfall to the alert on the smartphone. Municipalities, water associations and operators of critical infrastructure thus gain time to act and become more independent of general weather services.